Below are traffic changes to Portland’s bridges that will take place during Providence Bridge Pedal on Sunday, Aug. 8:
| Morrison Bridge: | OPEN both directions. Eastbound restricted to one lane 5 a.m. to 11 a.m. |
|---|---|
| Burnside Bridge | OPEN both directions. |
| St. Johns Bridge | OPEN both directions. Traffic restricted to one lane in both directions 7 a.m. to noon. |
| Sellwood Bridge | CLOSED westbound 5 a.m. to 9 a.m. Eastbound lanes open throughout the event |
| Ross Island Bridge | CLOSED westbound 5 a.m. to 11 a.m. Eastbound lanes open throughout the event |
| Marquam Bridge | Top deck (I-5 northbound) CLOSED 5 a.m. to noon. I-5 northbound traffic will be routed to I-405. Bottom deck (I-5 southbound) open throughout the event |
| Hawthorne Bridge | CLOSED eastbound 6:30 a.m. to noon. (note: outside eastbound lane will close Saturday evening) Westbound lane open |
| Steel Bridge | CLOSED both directions 7 a.m. to noon. |
| Broadway Bridge | CLOSED in both directions due to construction. |
| Fremont Bridge | Top deck (I-405 southbound) CLOSED 5 a.m. to noon. Bottom deck (I-405 northbound) open throughout the event |